FDOT
EAC was part of a team of consultants and was responsible for: • The development of traffic flow analysis factors based on existing traffic volumes; conversion of FSUTMS model volumes to projected ye...
City of Miami
As a result of increased congestion on the urban freeways and arterials in Downtown Miami, the City of Miami developed a micro-simulation model for the Downtown area using Paramics Microscopic Simulat...
Miami-Dade Public Works Department
This project involved approximately one mile of roadway design for the continuation of the NW 97th Avenue across SR 836. Included is the provision of an 1100 ft long bridge over SR 836. The bridge is...