Brighton Seminole Indian Reservation - Final Design Excess Water Storage and Treatment Reservoir
South Florida Water Management District
EAC provided the engineering services for the complete facilities design of a 450 acre water storage reservoir on the Brighton Seminole Indian Reservation. The goal of the project is to develop a final engineering design and specifications for construction, including all levees, canals and water control structures as well as provide capital and operation and maintenance cost estimates for the excess water storage and treatment reservoir