Fort Lauderdale's Port Everglades
EAC planned, designed, and administered the CM@Risk delivery of this new bridge. The bridge functions to expedite cargo traffic between Southport and Midport as trucks will be able to move inside the ...
FDOT District Six
EAC was responsible for this project involved the provision of engineering services for the preparation of roadway and structure plans required for the construction of the underpasses for the endanger...
Broward County
EAC was responsible for the highway design services for the reconstruction of Sheridan Street (2.1 miles), from west of N.W. 196th Avenue to east of N.W. 172nd Avenue. The design increases the number...
EAC provided the roadway design for the construction of a new five lane, double-leaf Bascule Bridge to replace the existing five lane structure, with 1’-6” wide shoulders and a 6’-6” and 10’-6” wide s...
City of Miami
EAC was responsible for these projects which were part of a continuing transportation contract and consist of the roadway improvements within the project limits of NE 39th and NE 40th Streets from Nor...