Miami-Dade Public Works Department
This project involved approximately one mile of roadway design for the continuation of the NW 97th Avenue across SR 836. Included is the provision of an 1100 ft long bridge over SR 836. The bridge is...
City of Miami
These projects were part of a continuing transportation contract and consist of the roadway improvements within the project limits of NE 39th and NE 40th Streets from North Miami Ave. to NE 2nd Ave. T...
Florida's Turnpike Enterprise
The Miramar Toll Plaza project is located along SR 821 within the Homestead Extension of the Florida’s Turnpike near milepost 47, west of the Turnpike mainline (SR 91) and east of University Drive (SR...
Orlando-Orange County
EAC was responsible for outside widening of the existing Good Homes Road bridge structures over SR 408 to adequately accommodate future traffic demands induced by the construction of the proposed new ...
Palm Beach County
EAC is responsible for the Engineering and Environmental Study for this Historic Bascule Bridge. The existing bridge is a circa 1939 rolling lift bascule bridge that carries Camino Real across the In...
City of Miami Beach
EAC provided the structural design services for the rehabilitation of the 41st Street Bridge. This was done as part of the improvements to the corridor to develop a signature roadway, which will spea...