Technology and Systems

Central Florida Expressway (CFX) Toll System Upgrade Design-Build Project

Client: Central Florida Expressway

Location: Orlando, Florida

Service: Technology and Systems

Project Overview

EAC is the Structural and Electrical EOR for this system-wide toll collection replacement Design-Build Project. The project entails the replacement of the legacy system for more than 300 lanes within the Orlando area. Project includes the design, furnishing, integration and testing of a new cash and electronic toll collection system to replace the legacy toll collection system.

More Projects