Technology and Systems

Tolling

Monroe County Card Sound Tolling System Design-Build Project

Client:
Monroe County Engineering Services Department
Location:
Monroe County, Florida
Service:
Technology and Systems
Project Overview
EAC provided engineering services associated with the roadway and infrastructure modifications for the migration of the existing Card Sound Toll Authority Tolling System from manual toll collection lanes to dedicated Electronic Toll Collection (ETC) lanes. The scope also included the coordination with the County’s Toll System Integrator.

More Projects

FDOT District 6 District-wide Replacement of 13 Dynamic Message Signs Design-Build Project

In-Lane Open Road Tolling System Deployed for the Greater Miami Expressway Agency (GMX)

FDOT District 6 I-95 Express Lanes Dynamic Message Signs Replacement Design-Build Project

Panama Electronic Tolling System Audits

FDOT District 4 SR 93 / I-75 Rest Area and Environmental Education Project Truck Parking Availability System

In-Lane ORT System Replacement on SR-874, SR-878 and SR-924

MDX SR 836 West Extension ORT and ITS Deployment

MDX Transportation Management Center (TMC) Operations

MDX System-Wide Implementation Of Dynamic Message Signs (DMS)

MDX/FDOT SR 826 / SR 836 Interchange Reconstruction

MDX SR 924, SR112, SR 874 and SR 878 Communications & Incident Management/Surveillance Deployment Projects

Central Florida Expressway (CFX) Toll System Upgrade Design-Build Project

Tampa Hillsborough Expressway Authority (THEA) General Engineering Consultant Services

More Projects