Transportation Engineering

Highways — Expressways / Managed Lanes

SR-826/Palmetto Expressway Express Lanes – Segment 2 (Canal C-8 to NW 67th Ave)

Client:
FDOT – District 6
Location:
Miami, Florida
Service:
Transportation Engineering
Project Overview
EAC provided design for the reconstruction of this 1.5-mile segment of the Palmetto Expressway to widen for the implementation of Express Lanes. The existing six-lane divided limited access facility will be widened to accommodate two express lanes and provide auxiliary lanes between the interchanges. A tolling point will be provided within this section and a Single Point Urban Interchange (SPUI) will be provided at NW 67 Ave. The project requires extensive coordination with the adjacent projects, FTE, City of Miami Lakes and Miami-Dade County. The project is the second segment (Segment 2) of six segments that extends the Express Lanes from I-75 to the I-95/Golden Glades Interchange.

More Projects

Interchange Improvements to the Homestead Extension of Florida’s Turnpike

Hard Rock Stadium Pedestrian Bridges

MDX SR 83628 Operational, Capacity, and Interchange Improvements

Improvements to the PortMiami Wharf 6 & 7 Cargo Yards

PortMiami North Cruise Blvd Flyover Bridge

Complete Infrastructure & Streetscape Improvements on Franjo Road

Monroe County Card Sound Tolling System Design-Build Project

Tom’s Harbor Bridge Repair

MiamiCentral Station – Brightline

Structural Design for the MIA People Mover

Reconstruction, Milling and Resurfacing of SW 1st Street in Miami-Dade County

Milling and Resurfacing SR 25/US 27

PortMiami Tunnel Peer Review

I-75 Alligator Alley Rest Area

MIC Earlington Heights

IndyGo Downtown Transit Center

41st Beautification

Good Homes Road

IndyGo Red Line Bus Rapid Transit

Charlotte Area Transit System (CATS) – Blue Line Extension (BLE)

More Projects